Free Flood Repair Requests Insurance, Safety & Help Programs Flood Damage Repairs Across Ottawa
Request Flood Repairs
Permits & Rebuilding | 0 views |

Who applies for the permit on a Stittsville flood repair?

Question

Who applies for the permit on a Stittsville flood repair?

Answer from Flood Repair IQ

In the City of Ottawa, the person who applies for a building permit is the property owner or a person the owner authorises in writing, such as the contractor doing the work. Either can be the applicant; your contract should make clear which party is responsible for pulling any required permits.

For a flood repair in Stittsville, not every task needs a permit. The City of Ottawa's Building Code Services lists flooring replacement and removing drywall or interior finish to allow insulation to dry as work that does not require one. A permit is required if structural framing, support posts, beams or joists are being removed or replaced, or if insulation is being replaced with a different type than what was originally there (for example, switching from batt to spray foam). Where drywall is being put back, the City does not list that work either way, so ask Building Code Services directly before assuming no permit is needed.

For repairs to damage from the July 1, 2026 event, the City of Ottawa has suspended fees for building permits, demolition permits and access to building permit records for the repair, reconstruction or demolition of homes and buildings damaged by that storm. That suspension applies to the permit fee itself; the permit process and inspections still apply.

Electrical repairs are handled separately: a Licensed Electrical Contractor files a notification with the Electrical Safety Authority rather than a City building permit, and you should ask for the ESA Certificate of Acceptance for your records and for your insurer.

A few things worth confirming in writing before work begins:

  • Which permits the contractor will apply for, and which remain your responsibility
  • That the scope of work matches what the permit application describes
  • That the contractor will provide copies of any permit and inspection records
The City's Building Code Services office is the right place to ask about any specific task you are unsure about, and your insurer should be told in writing about any permit requirements, since the City notes that failing to obtain a required permit can affect insurance coverage in the event of a loss.

Before the first tool comes out, have a written contract in hand that sets out the full scope of work, the price, the start and completion dates, and which party is responsible for each permit.

Ottawa Flood Restoration

Want this done at your place?

Tell us what got damaged. We pass your request to local contractors to help get someone in quickly. Free, no pressure.

Add flood details (optional): what got wet, insurer, timing
What got damaged?

Older home? Have materials checked for asbestos before anything is torn out: ottawaabatement.com.

Fields marked are required.

We won't call you. There's no phone box above because we don't ask for one — your estimate comes by email, on your time.

Request received We’re passing your details to local contractors to help get someone in quickly. They reply by email. A confirmation is on its way to your inbox.

Flood Repair IQ -- Built from the Ontario Building Code, Ontario regulations and City of Ottawa sources and real construction experience. Answers are for informational purposes only and are not a professional assessment.

Ready to Get Quotes?

Tell us what got damaged. We pass your request to local contractors to help get someone in quickly. Free, no obligation.

Request Flood Repairs