What a Flood Repair Quote Should List for Your Insurer
An itemized quote lets you and your adjuster see each part of the job instead of one number. Use the list below with any contractor, tick off each line as it appears in the quote, and ask about anything missing before you sign.
Send your repair requestTick each line as you find it in the quote. Anything missing is a question for the contractor before you sign.
Before anything comes out
- City of Ottawa: photograph and document damaged property before beginning cleanup, where it is safe to do so
- City of Ottawa: notify your insurance adjuster if materials are discarded for health and safety reasons
- City of Ottawa: properties built before 1990 may have asbestos, so check with a professional before any repair or demolition work
Tear-out, room by room
- Ottawa Public Health: remove and discard porous, wet building materials such as drywall, insulation and ceiling tiles
- Health Canada: dispose of insulation exposed to flood water that cannot be dried
- Health Canada: flooring soaked by flood water should be removed and discarded
- Ottawa Public Health (ceiling tiles); ask the contractor to list the rest separately
Disposal
- City of Ottawa: renovation waste such as drywall is not collected with regular garbage; tipping fees were reinstated on September 8, 2026
Drying
- Health Canada: a house is less likely to grow mould if dried within 48 hours
- TSSA: drying fans can create negative pressure that lets carbon monoxide re-enter the home
Mould
- Health Canada: a professional for a single patch larger than three square metres, sewage-contaminated water, or water inside wall or ceiling cavities
- Health Canada does not recommend testing the air for mould
Electrical and gas
- Electrical Safety Authority flood guidance
- City of Ottawa; your gas utility
Rebuild like for like
- City of Ottawa: a different insulation type, such as batts to spray foam, needs a building permit
- City of Ottawa: permit fees are waived for repairs to homes damaged by the July 1, 2026 event; for putting walls back, ask Building Code Services
The contract
- Consumer Protection Act, 2002, s.10(1): no more than 10 per cent above an estimate in the agreement
- Construction Act, s.22(1): a 10 per cent holdback; ask a lawyer about anything further
- WSIB: construction businesses must have coverage, with some exceptions
- Call your insurer first. Flood (overland) and sewer-backup coverage are optional add-ons, so your policy wording decides.
- Ask your insurer, in writing, how contractor choice and payment work under your policy.
- FCAC says the time limit to make a claim "usually varies from 90 days to 12 months".
Get an itemized flood repair quote
Tell us what got damaged, add your claim number if you have one, and we pass your request to local contractors to help get someone in quickly, with a quote you can check against this list.
Request received We’re passing your details to local contractors to help get someone in quickly. They reply by email. A confirmation is on its way to your inbox.
Questions about this job
- Should I wait for the adjuster before booking flood repairs in Nepean?
- What receipts should I keep after a basement flood in Gloucester?
- How long do I have to file a flood claim in Ontario?
- What should an itemized flood repair quote in Ottawa list for my insurer?
- The flooded Gloucester basement smells musty after drying. Is that mould?
- Where does flood debris from an Ottawa basement go now that disposal fees are back?